{"id":1704,"date":"2022-12-05T17:39:57","date_gmt":"2022-12-05T17:39:57","guid":{"rendered":"https:\/\/azeta.pro\/?p=1704"},"modified":"2024-06-09T10:04:43","modified_gmt":"2024-06-09T10:04:43","slug":"avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche","status":"publish","type":"post","link":"https:\/\/azeta.pro\/en\/avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche\/","title":{"rendered":"The TAP project for the supply of gas, oil and other energy sources started"},"content":{"rendered":"<p><br>TAP. The process to increase supply and supply capacities along the pipeline has just been initiated <strong>Trans Adriatic Pipeline<\/strong> (TAP). The Energy Regulatory Authorities of Albania (ERE), Greece (RAE) and Italy (ARERA) approved<br>jointly the rules for the first binding phase.<\/p>\n\n\n\n<p>The process is carried out in a coordinated manner between TAP companies and national transmission operators <strong>SNAM Rete Gas and DESFA<\/strong>under Regulation (EU) 2017\/459. The process is aimed at allocating long-term capacity to existing or newly constructed Interconnection Points (IPs) along the TAP route, which will increase the amount of gas that can be imported into Europe. <\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_79_2 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Index<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewbox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewbox=\"0 0 24 24\" version=\"1.2\" baseprofile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1' ><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/azeta.pro\/en\/avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche\/#I_punti_di_connessione_del_TAP\" >The TAP connection points<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/azeta.pro\/en\/avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche\/#Rete_interna_del_Gas\" >Internal Gas Network<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/azeta.pro\/en\/avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche\/#IAP_%E2%80%93_Ionian_adriatic_pipeline\" >IAP - Ionian Adriatic Pipeline<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/azeta.pro\/en\/avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche\/#che_cosa_volete_fare_ora\" >what do you want to do now?<\/a><\/li><\/ul><\/nav><\/div>\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"I_punti_di_connessione_del_TAP\"><\/span>The TAP connection points<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>The Interconnection Points concerned are: <\/p>\n\n\n\n<ul>\n<li>Kipoi (Turkey Greece), <\/li>\n\n\n\n<li>Komotini (Greece),<\/li>\n\n\n\n<li> Nea Mesimvria (Greece), <\/li>\n\n\n\n<li>Kucove (Albania), <\/li>\n\n\n\n<li>Relievi Roskovec (Albania), <\/li>\n\n\n\n<li>Fier (Albania) <\/li>\n\n\n\n<li>Melendugno (Italy). <\/li>\n<\/ul>\n\n\n\n<p>The expansion project envisages four possible levels of expansion at the Kipoi entry point (referred to as minimum, limited, partial and maximum) depending on the binding proposals to be received, up to a maximum of 27 million Smc (standard cubic metres)\/day.<\/p>\n\n\n\n<p><strong>The binding phase started on 14 November<\/strong> and bids can be submitted in January 2023. TAP - <strong>Trans Adriatic Pipeline <\/strong>- is part of the Southern Gas Corridor, which transports natural gas from the Shah Deniz II field in Azerbaijan to Europe. Linking up with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP crosses northern Greece, Albania and the Adriatic Sea before arriving in southern Italy, in Puglia, where it connects to the Italian gas distribution network.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Rete_interna_del_Gas\"><\/span>Internal Gas Network<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>A few days after the mid-November state visit of the President of the Republic of Azerbaijan Ilham Aliyev to Albania, the Azerbaijani Ambassador in Tirana, His Excellency Anar Huseynov, spoke in the local media. He said he imagined that 'Albania could become a beneficiary of natural gas from Azerbaijan, but the lack of adequate networks complicates the issue. <\/p>\n\n\n\n<p>Therefore, our government wants to discuss the possibility of investing in the infrastructure of the <strong>Albanian gas<\/strong> and start, first of all, with a separate special agreement. If the investment is successful, then its scope can be expanded.<\/p>\n\n\n\n<p><strong>Agreements have been in place between Albania and Azerbaijan since 2014 to plan interventions in favour of the development of local gasification activities, agreements concluded with the Azerbaijani state-owned company Socar.<\/strong><br><\/p>\n\n\n\n<div style=\"height:26px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"gb-block-image gb-block-image-de95cfad\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"600\" class=\"gb-image gb-image-de95cfad\" src=\"http:\/\/azeta.pro\/wp-content\/uploads\/2022\/12\/Gasdotto-adriatico-albania-italia.png\" alt=\"Gasdotto adriatico albania italia\" title=\"Adriatic gas pipeline albania italy\" srcset=\"https:\/\/azeta.pro\/wp-content\/uploads\/2022\/12\/Gasdotto-adriatico-albania-italia.png 800w, https:\/\/azeta.pro\/wp-content\/uploads\/2022\/12\/Gasdotto-adriatico-albania-italia-300x225.png 300w, https:\/\/azeta.pro\/wp-content\/uploads\/2022\/12\/Gasdotto-adriatico-albania-italia-768x576.png 768w, https:\/\/azeta.pro\/wp-content\/uploads\/2022\/12\/Gasdotto-adriatico-albania-italia-16x12.png 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<div style=\"height:26px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Some preconditions for this were created as early as 2021, when in July Tap and the Albanian company AlbGaz signed an agreement to design and build a gas outlet at Fier Sud for a connection to the future domestic network in the Land of Eagles.<\/p>\n\n\n\n<p><strong>The Tap pipeline itself can offer an interconnection point to the planned IAP,<\/strong> the Ionian adriatic pipeline to connect Albania with Croatia, Montenegro and Bosnia Herzegovina, and thus determine the south-east European corridor.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"IAP_%E2%80%93_Ionian_adriatic_pipeline\"><\/span><strong> IAP<\/strong> - Ionian Adriatic Pipeline<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>After all, it was Croatia, Montenegro and Albania that signed a declaration on the IAP in 2007, and the pipeline should be connected to the Trans Adriatic Pipeline, through which Azeri gas is currently supplied to Italy, Greece and Bulgaria. <\/p>\n\n\n\n<p><strong>The IAP is expected to be 530 kilometres long<\/strong> with a transport capacity of 5 billion cubic metres of gas per year. The estimated cost of the project is EUR 610 million. The pipeline is expected to cross Bosnia and Herzegovina and Montenegro, connecting the Croatian city of Split and the Albanian city of Fier. <\/p>\n\n\n\n<p><strong>The State Oil Company of the Republic of Azerbaijan is already a technical advisor to the IAP. <\/strong>In anticipation of which, the Middle Eastern state with capital Baku is supporting interconnector projects on European soil: one between Greece and Bulgaria, the next between Bulgaria and Serbia in 2023.<\/p>\n\n\n\n<p>Meanwhile in Vlora, as repeatedly stated by the Albanian government and the <strong>Deputy Prime Minister Belinda Balluku<\/strong>US investments of <strong>Excelerate Energy and ExxonMobil,<\/strong> for liquid natural gas processing and thermoelectric production, are such that they are an integral and structural part of the IAP corridor, and an agreement was signed last June between the competent ministries of Albania and Kosovo and between the respective companies for the shared use of these floating facilities<br>state electricity. <\/p>\n\n\n\n<p>The production of electricity from thermal sources is entrusted to two leased vessels anchored in the Triport area and intended to meet 16 per cent of the country's needs for a two-year period until work on the fixed power plant is completed.<\/p>\n\n\n\n<div style=\"height:51px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"has-text-align-center wp-block-heading\" id=\"block-f640ab86-1dd9-47fc-9bbf-2bf15609f5d0\"><span class=\"ez-toc-section\" id=\"che_cosa_volete_fare_ora\"><\/span>what do you want to do now?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p id=\"block-ed3000bd-d577-4ac4-8863-93b5cb587a3e\"><strong>Do you want to stay in Europe with a recession looming, galloping inflation and ever higher gas and electricity costs and a shortage of raw materials, or<\/strong> <strong>would you like to get in touch with us to develop your business opportunity in Albania where you save on taxes ? <\/strong><\/p>\n\n\n\n<p id=\"block-ed3000bd-d577-4ac4-8863-93b5cb587a3e\"><strong>If you want to know more, please fill in the form below and one of our consultants will contact you within 24 hours.<\/strong><\/p>\n\n\n\n<div class=\"wp-block-contact-form-7-contact-form-selector\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f6-o1\" lang=\"en-US\" dir=\"ltr\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/posts\/1704#wpcf7-f6-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\" data-trp-original-action=\"\/en\/wp-json\/wp\/v2\/posts\/1704#wpcf7-f6-o1\">\n<div style=\"display: none;\">\n<input type=\"hidden\" name=\"_wpcf7\" value=\"6\" \/>\n<input type=\"hidden\" name=\"_wpcf7_version\" value=\"5.9.8\" \/>\n<input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/>\n<input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f6-o1\" \/>\n<input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/>\n<input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<input type=\"hidden\" name=\"_wpcf7_recaptcha_response\" value=\"\" \/>\n<\/div>\n<p><label> Your first and last name<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span> <\/label>\n<\/p>\n<p><label> Your email<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span> <\/label>\n<\/p>\n<p><label> Phone<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel-141\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"tel\" name=\"tel-141\" \/><\/span> <\/label>\n<\/p>\n<p><label> Website (optional)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"url-328\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-url wpcf7-text wpcf7-validates-as-url\" aria-invalid=\"false\" value=\"\" type=\"url\" name=\"url-328\" \/><\/span> <\/label>\n<\/p>\n<p><label> Subject of your request<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-subject\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-subject\" \/><\/span> <\/label>\n<\/p>\n<p><label> Select interest<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"menu-739\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" multiple=\"multiple\" name=\"menu-739[]\"><option value=\"Costituzione societ\u00e0 Dubai\">Dubai Company Constitution<\/option><option value=\"Richiesta residenza Dubai\">Dubai residency required<\/option><option value=\"Costituzione societ\u00e0 Albania\">Company Constitution Albania<\/option><option value=\"Apertura Partita IVA professionista\">Opening a professional VAT number<\/option><option value=\"Consulenza Aziendale\">Corporate Consulting<\/option><option value=\"Apertura conto per non residenti\">Account opening for non-residents<\/option><option value=\"Ricerca Finanziamenti per progetto\">Project Funding Search<\/option><option value=\"Ricerca Finanziamento Europa\">Search Funding Europe<\/option><option value=\"Internazionalizzazione d&#039;Impresa\">Internationalisation of business<\/option><option value=\"Investimento immobiliare\">Real estate investment<\/option><option value=\"Investimento di Portafoglio\">Portfolio Investment<\/option><option value=\"VISA Permesso di soggiorno\">VISA Residence permit<\/option><option value=\"Richiesta cittadinanza Albanese\">Application for Albanian citizenship<\/option><option value=\"Altro...\">More...<\/option><\/select><\/span><\/label>\n<\/p>\n<p><label> Your message<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" name=\"your-message\"><\/textarea><\/span> <\/label>\n<\/p>\n<p><label>GDPR Privacy and Cookies Consent (required)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"acceptance-52\"><span class=\"wpcf7-form-control wpcf7-acceptance\"><span class=\"wpcf7-list-item\"><label><input type=\"checkbox\" name=\"acceptance-52\" value=\"1\" checked=\"checked\" aria-invalid=\"false\" \/><span class=\"wpcf7-list-item-label\">I give my consent<\/span><\/label><\/span><\/span><\/span> to the processing of my data for the purposes of their treatment and I confirm that I have read the privacy policy of the site.<br \/>\n<\/label>\n<\/p>\n<p><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Send\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<input type=\"hidden\" name=\"trp-form-language\" value=\"en\"\/><\/form>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>TAP. The process that will lead to increased supply and supply capacities along the Trans Adriatic Pipeline (TAP) pipeline has just begun. The Energy Regulatory Authorities of Albania (ERE), Greece (RAE) and Italy (ARERA) have jointly approved the rules for the first binding phase. The procedure is being carried out in a coordinated manner between ... <a title=\"The TAP project for the supply of gas, oil and other energy sources started\" class=\"read-more\" href=\"https:\/\/azeta.pro\/en\/avviato-il-progetto-tap-per-lapprovvigionamento-di-gas-petrolio-e-altre-fonti-energetiche\/\" aria-label=\"More on Launch of the TAP project to supply gas, oil and other energy sources\">Read more<\/a><\/p>","protected":false},"author":1,"featured_media":1705,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"iawp_total_views":5,"footnotes":""},"categories":[17],"tags":[49,50,48],"_links":{"self":[{"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/posts\/1704"}],"collection":[{"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/comments?post=1704"}],"version-history":[{"count":1,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/posts\/1704\/revisions"}],"predecessor-version":[{"id":2222,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/posts\/1704\/revisions\/2222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/media\/1705"}],"wp:attachment":[{"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/media?parent=1704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/categories?post=1704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/azeta.pro\/en\/wp-json\/wp\/v2\/tags?post=1704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}